- Category
- Rooftop Solar
- Location
- Nilufer / Bursa
- Date
- October 2024
- Installed Capacity
- 2.4 MWp
- Annual Generation
- 3,150 MWh
- CO₂ Reduction
- 1,520 t/year
The 2.4 MWp plant installed on the roofs of three production halls cut the factory's annual electricity cost by about 38 percent.
The existing MV infrastructure was reinforced and integrated with the energy management system via SCADA.